Once fully operational, the Virar-Alibaug Multimodal Corridor will redefine the geography of the Mumbai Metropolitan Region. It represents a shift from a city-centric development model to a region-centric one, promising to make the MMR a global economic powerhouse. | Feature | Detail | | :--- | :--- | | Total Length | 98.5 km | | Width | 8 Lanes (plus service roads) | | Estimated Cost | Approx. ₹10,000 - ₹12,000 Crore | | Executing Agency | MMRDA | | Key Benefit | Reduces travel time between Virar and Alibaug to ~1.5 hours | Note: This document is a synthesized summary based on public project reports and MMRDA releases. For detailed engineering drawings or tenders, please refer to the official MMRDA website. Buildofy Free Ebook Cracked - 3.79.94.248